COMPLETE MINING SOLUTIONS. FROM IDEA TO PRODUCTION
SERVICES FOR UNDERGROUND WATER
Geological analysis
Geological analysis of the prospects for mineral resources is a complex and multi-stage process
Obtaining license (special permit)
A special permit for the use of subsoil is a document right to conduct geological exploration, and/or extraction of minerals.
Exploration registration procedure
Form 3‑gr is a list of studies that require mandatory registration for effective results of subsurface exploration.
Well drilling plan
Well drilling plan is the core technical document prepared for the design and execution of well construction works.
Well Drilling
A private well provides reliable, high-quality groundwater and independence from centralized water supply in the Kyiv region.
Registration of well passports
Water wells passport contains information about the technical state of the well, geological and ecological parameters.
Well Use Permit
Special water use permit is the basis aimed to ensure the rational use of water resources.
Test pilot production plan
Pilot Production Plan defines the scope, methodology, and objectives of pilot-scale testing to validate production technologies and parameters.
Test Pilot Production
Test Pilot Production is a complex of activities that includes scientific research and industrial development.
Reserves Calculation
Reserves Calculation is a professional service focused on determining the quantity, quality, and economic viability of mineral reserves based.
Field Development Plan
Technical plan is a document that ensures extraction and optimal use of groundwater.
Environmental impact assessment
The Institute of Geology provide qualified assistance in the process of obtaining a positive conclusion on the environmental impact assessment.
Sanitary protection zone project
Sanitary protection zones (SPZ) are organized at all water intakes which are used for economic and drinking purposes.
Land Zoning Plan
A Land Zoning Plan defines permitted land uses and functional zones of a territory in accordance with planning and regulatory requirements.
Extraction
Extraction requires strict legal compliance, environmental responsibility, and safe, sustainable mineral production.
Geological audit of a mining asset: protect your investments
Acquiring a subsoil use asset requires professional assessment beyond finance.
Well construction supervision
Drilling process requires control over the abidance by the Well Drilling Project as well as by the geological and engineering order.
Hydrogeological servicing
Hydrogeological servicing is a professional supervision of the groundwater deposits’ development.
Annual Groundwater Use Plan
This plan is one of the main documents required to start the groundwater deposit development.
Annual reporting
For any subsurface user the end of the year is sharply associated with the need to provide an annual report.



















